As the title says.
I'm looking for advise on prepping for, the normal depth of, and someone that can do the job! Its a garage floor 5x3m in Darlington.
Wondered what would be the best thing to do with the gap around the existing slab in terms of prep. I have left the old slab in and pushed the walls out to get more space.
The old slab is about 2-3inches thick straight onto hardcore and clay. I would guess at some sort of dpm and maybe thin insulation boards between the concrete and the screed?
To prep for screed and fill the floor back up to the walls is there anything worth doing other than getting some hardcore and concrete back in to something like level?
Next question would be; how much is sensible if I start ringing round for quotes?
Hey chad while I'm on topic:
That wall................came out ok I think for a first effort!
for doing that myself!! through the middle of winter!!
didn't learn though. Doing the garage now ........through the middle of winter!!
Summer is for fun stuff like riding bikes!!![]()